Finished Turtlelake River bridge near Mervin, with a galvanized rail over the water

Case study

Turtlelake River Bridge Strengthening & Rebuild

Near Mervin, Saskatchewan

InfrastructureStructuralConstruction Management

The Turtlelake River bridge carries Township Road 502, near Mervin. It's a 21.3 m single-span steel girder bridge with a precast concrete deck, built in 2018. When the bridge was found to need strengthening, the Rural Municipality of Mervin No. 499 asked us a simple question: could it be saved? We showed that it could. We designed a rebuild that keeps the existing girders, bracing and abutment caps, puts them on new foundations, and gets the deck and girders working together again.

Project facts

  • Services Structural assessment and design; tender and contract administration
  • Sector Municipal infrastructure

Challenge

The bridge was only a few years old but needed strengthening to meet code. Its girders and deck weren't acting together as a single composite system, so it couldn't carry the loads it was designed for.

Scope

We were Engineer-of-Record from start to finish. We assessed what could be reused, designed the strengthening and the rebuild on new foundations, and administered the construction contract.

Result

The salvaged steel went back up on new foundations and the bridge reopened to traffic on May 1, 2026, meeting current code. The RM got a code-compliant bridge while reusing most of the original structure.

Project facts

  • Services Structural assessment and design; tender and contract administration
  • Sector Municipal infrastructure

Contact

Have a project in mind?
Contact us today.

Tell us about your project and you'll hear back from the engineer who will do the work.

Stay connected

Follow Sevana for project updates, engineering insights and team news.