Projects
Work we're proud to put our name on.
A selection of our infrastructure, industrial and building projects across Western Canada, Ontario and the North.

Highway 955 Bridge Replacement, Clearwater River
About 63 km north of La Loche, Saskatchewan
The 1970s truss was replaced with a 49 m girder bridge.

Turtlelake River Bridge Strengthening & Rebuild
Near Mervin, Saskatchewan
A 21.3 m steel girder bridge near Mervin, salvaged, strengthened and reopened to current code.

CropMax Acres Grain Bin & Dryer Foundation Slabs
Near Cut Knife, Saskatchewan
Foundation slabs for six hopper-bottom grain bins and a dryer near Cut Knife, Saskatchewan.

Jedburgh & Township Road 275 Bridge Replacements
Near Yorkton, Saskatchewan
Two timber bridges near Yorkton replaced with wider, single-span precast concrete crossings.

Torquay Bridge Replacement & Road Realignment
Near Torquay, Saskatchewan
A 1957 timber bridge near Torquay is being replaced with a 30 m precast crossing and a new approach.

CN Armstrong Station Bunkhouse
Armstrong, Ontario
Civil and structural work for a 44-suite crew bunkhouse at CN's Armstrong Station, Ontario.

Pipestone Creek Bridge Working Load Assessment
Near Oak Lake, Manitoba
A working-load assessment so a pile driver could work from the deck of a timber bridge near Oak Lake.
Contact
Have a project in mind?
Contact us today.
Tell us about your project and you'll hear back from the engineer who will do the work.
Stay connected
Follow Sevana for project updates, engineering insights and team news.
