Case study
Pipestone Creek Bridge Working Load Assessment
Near Oak Lake, RM of Sifton, Manitoba
A four-span timber bridge over Pipestone Creek, near Oak Lake, was due for a strengthening upgrade from Manitoba Transportation and Infrastructure. The plan was to add new steel piles at every support and four new timber stringers to each span. Harbuilt Construction Ltd. won the contract and wanted to drive the new piles from the bridge deck itself, so they called Sevana to find out whether the old bridge could take the load.
Project facts
- Services Structural assessment and construction support (temporary works)
- Sector Municipal infrastructure; transportation
Challenge
It was a big ask for a small bridge. Harbuilt's pile driver, an excavator with a pile lead, a drop hammer and crane mats, weighs about 429 kN. That's nearly three times the bridge's 15-tonne posted rating. The 39 m bridge dates back to the late 1970s; there were no test results for the timber, and the rig would be standing on spans that were partway through being strengthened. The schedule was tight too: a winter contract with a March 20 completion date, and all equipment had to be out of the creek before spring.
Scope
As Harbuilt's engineer for the temporary works, we started with the equipment itself, adding up the excavator, lead, hammer and mats to build a realistic construction load case. We then showed how laying two crane mats across the bridge, centred over a pier, spreads that weight out across many stringers and shares it between supports. From there we checked the existing timber stringers for bending, shear and deflection to CSA O86, and we worked out how much stronger each pile bent gets as the new steel piles go in.
We also helped shape Harbuilt's pile-driving plan. The rig always works from the mats and never sits on the bare deck. The new centre stringers go in before the rig moves onto each span, and the rig stays close to the supports that have already been strengthened. Deflection was monitored during driving, and we visited the site to check working loads in person.
Result
We issued our signed load calculations and stringer checks, and Harbuilt attached them to its pile-driving plan. With that engineering in hand, Harbuilt could work from the existing deck instead of building a separate work platform or putting heavy equipment in Pipestone Creek.
Project facts
- Services Structural assessment and construction support (temporary works)
- Sector Municipal infrastructure; transportation
Contact
Have a project in mind?
Contact us today.
Tell us about your project and you'll hear back from the engineer who will do the work.
Stay connected
Follow Sevana for project updates, engineering insights and team news.