Saskatoon, Saskatchewan, Canada · Authorized to practise in SK · AB · MB · ON · NWT · NU

Mon–Fri, 8 AM–5 PM · (306) 203-1937 · @sevanaconsulting · Sevana Strategy ↗

Projects

Work we're proud to put our name on.

A selection of our infrastructure, industrial and building projects across Western Canada, Ontario and the North.

The new 49 m steel girder bridge on Highway 955 over the Clearwater River, about 63 km north of La Loche, Saskatchewan

Highway 955 Bridge Replacement, Clearwater River

About 63 km north of La Loche, Saskatchewan

InfrastructureConstruction Management

The 1970s truss was replaced with a 49 m girder bridge.

View project →

Finished Turtlelake River bridge near Mervin, with a galvanized rail over the water

Turtlelake River Bridge Strengthening & Rebuild

Near Mervin, Saskatchewan

InfrastructureStructuralConstruction Management

A 21.3 m steel girder bridge near Mervin, salvaged, strengthened and reopened to current code.

View project →

Reinforced foundation slab for hopper-bottom grain bins near Cut Knife, Saskatchewan, before the pour

CropMax Acres Grain Bin & Dryer Foundation Slabs

Near Cut Knife, Saskatchewan

IndustrialStructural

Foundation slabs for six hopper-bottom grain bins and a dryer near Cut Knife, Saskatchewan.

View project →

Completed precast concrete bridge with a steel rail and gravel approach, near Yorkton, Saskatchewan

Jedburgh & Township Road 275 Bridge Replacements

Near Yorkton, Saskatchewan

InfrastructureStructuralConstruction Services

Two timber bridges near Yorkton replaced with wider, single-span precast concrete crossings.

View project →

Existing four-span timber bridge over Long Creek near Torquay, Saskatchewan

Torquay Bridge Replacement & Road Realignment

Near Torquay, Saskatchewan

InfrastructureStructuralConstruction Services

A 1957 timber bridge near Torquay is being replaced with a 30 m precast crossing and a new approach.

View project →

Rendering of the three-storey CN crew bunkhouse at Armstrong Station, Ontario

CN Armstrong Station Bunkhouse

Armstrong, Ontario

ResidentialCivilStructural

Civil and structural work for a 44-suite crew bunkhouse at CN's Armstrong Station, Ontario.

View project →

Timber bridge over frozen Pipestone Creek near Oak Lake, Manitoba, with a steel rail along the deck

Pipestone Creek Bridge Working Load Assessment

Near Oak Lake, Manitoba

InfrastructureStructuralConstruction Services

A working-load assessment so a pile driver could work from the deck of a timber bridge near Oak Lake.

View project →

Contact

Have a project in mind?
Contact us today.

Tell us about your project and you'll hear back from the engineer who will do the work.

Stay connected

Follow Sevana for project updates, engineering insights and team news.